peters_2's Notes
Notes submitted or commented on by peters_2
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 3953892 | peters_2 | Sidewalk, crosswalk, island, crosswalk to path on the other side of the parking lot. |
|||
| 3953910 | peters_2 | New wavy sidewalk going up Amidon |
|||
| 3929352 | peters_2 | Sidewalk widens to 3m, continues to bridge. N to just S of New Leaf Plaza crossing, only 1m wide then 3m past 21st. |
|||
| 3929347 | peters_2 | Here is where the bridge sidewalk ends, in a 5m dia circle for some reason. Curb prevents accessible street crossing so it doesn't look like that is the plan. Terrain slopes down 2m to grade of neighboring parking lots. |
|||
| 3929350 | peters_2 | New start of divided street going north. Bridge itself has no median. |
|||
| 3929324 | peters_2 | Site prep shows this segment of bike path under the bridge, to the same distance on W side, will be replaced with concrete, 3m wide. (The asphalt path is 2.5 to 3m). |
|||
| 3929331 | peters_2 | Actual start of radius turn to bridge path. I estimated it wrong last week when I drew it. Not yet paved, but the path is clear from the site prep. |
|||
| 3929319 | peters_2 | Path under construction to join the bridge. Looks to be 2.5-3m, with radiuses here at bike path for both N and S bound. Likely concrete rather than asphalt like the bike path. |
|||
| 3929311 | peters_2 | Sidewalk crossing (unmarked, unsignalled). Sidewalk exists on W side of Amidon, 13th to 21st, interrupted by the bridge reconstruction. |
|||
| 3929310 | peters_2 | 9m dia circular flagstone path around tree. Human+dog drinking fountain. |