meisoof's Notes
Notes submitted or commented on by meisoof
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5550212 | lone-cloud | Unable to answer "Do these steps have a handrail?" – Steps – way/1562013558 via StreetComplete 63.4: no stairs here |
|||
| 5323866 | dgryski | Axe Capoeira probably not in the middle of the parking lot. Should probably be moved more generally into the temesewtx building. |
|||
| 5427274 | Death B Grapes | Is Stop #58741, Cumberland St (WB) at E 6th Ave, here? Translink has it on timetables and maps, but no imagery seems to have it. |
|||
| 5401288 | TriangleMaple | Bus stop here under construction (Future R2 Rapidbus) |
|||
| 5425210 | dgryski | Construction here is now finished: https://www.newwestcity.ca/2026/07/28/city-of-new-westminster-completes-westward-expansion-of-westminster-pier-park.php |
|||
| 5226571 | Sieva | 1. seems like the detour was temporary — check the state
|
|||
| 5226570 | Sieva | Pedestrian areas should be surveyed and better mapped all around the community centre |
|||
| 5244311 | This church is demolished and the area is under construction to build new residential buildings. New addresses are 7135 Walker Ave and 7244 Arcola St. |
||||
| 5138538 | DENelson83 | Syntax errors. Street addresses are not to be grouped like this, as they end up being unsearchable on Garmin devices. Please put each address in a separate node or way. |
|||
| 5279091 | dgryski | Initial construction work for this part is done: https://www.newwestcity.ca/2026/05/04/westminster-pier-park-westward-expansion-phase-1-opening.php |