crassula's Notes
Notes submitted or commented on by crassula
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5187074 | InfiNorth | There are no protected bike lane at this intersection. Removed from map but will need a new survey when construction complete. Survey date: March 1st, 2026 |
|||
| 4955858 | crassula | New school needs to be added here, plus eventually modifications to old building which is in the process of being demolished. |
|||
| 5424764 | crassula | Intersection currently being updated with separate right turn, crosswalks, and pedestrian island |
|||
| 5234722 | New crossing and bike lanes currently under construction |
||||
| 5424765 | crassula | New bike lane crossing geometry |
|||
| 5284286 | crassula | Added some new open features. But will need more precision when satellite imagery available or from a visit |
|||
| 4807779 | crassula | A multi-use path was under construction to the silver bridge. Is it completed?
|
|||
| 5316646 | crassula | Need to check if these trails are bicycle designated and could be used to connect east-west from the Lochside trail |
|||
| 4297959 | smithkm | https://www.saanich.ca/assets/Local~Government/Documents/Engineering/Cycling-%20Network.pdf Shows this as a cycle path |
|||
| 5199976 | InfiNorth | Full marked and RRFB signalized Crossing under construction - Will require survey in next two months along with rest of Cook Street for protected bike lanes. |