PhilBike24's Notes

Notes submitted or commented on by PhilBike24

Id Creator Description Created at Last changed
Resolved 5215851 PhilBike24

Does this bridleway exist? I tried to walk along here in March 2026 and I could see no trace of a path.

Resolved 5081595 PhilBike24

Does HS2 route need realigning here to pass over section of retained bridge abutment?

Unresolved 5181400 PhilBike24

Is this crossing closed? Also is the new diversion through nearby underpass under construction?

Resolved 4591595

This path does not exist

Resolved 1957247 rskedgell

Lord Street (way/4843867) is tagged as highway=pedestrian, but is also a member of National Cycle Network route 56 (relation/156406). Is cycling permitted here i.e. should it be tagged as bicycle=yes or bicycle=dismount?

Resolved 2918823 PhilBike24

Pedestrian area not displaying.

Resolved 2806275 PhilBike24

Do these paths connect?

Resolved 2682664 PhilBike24

Crossrail lines are shown as under construction. But now that trial running has started in 2021, should tracks be shown as completed?

Resolved 2678145 CycleStreets

Is there a no-cycling sign for this cut-through? Currently is footway so cycles not permitted.

Resolved 2254780

Store permanently closed