PeterOnTheRoad's Notes
Notes submitted or commented on by PeterOnTheRoad
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4741460 | PeterOnTheRoad | If travel from the roundabout, the new 50mph sign is about 5 meters after the flood sign. Roughly at
So the current road segment need to be splitted so the transition of speed limit from 40mph to 50mph is at correct position. |