Changeset When Comment
173710232

Robuster did you make a section of Bayview Avenue access=no?

179012326

I have made some further changes to levels/layers on the Metro Tunnel tracks to ensure our DTP systems have the correct data. Please refrain from making changes that could have adverse impacts on the public transport network. Thank you

179012326

Why have you changed the entirety of the metro tunnel level/layer to -4 without considering the impact of these edits? The levels at each station are: -2 at Anzac, -4 Town Hall, -3 State Library, -2 Parkville & -2 Arden. The track levels need to match these levels for the DTP maps and journey planning to work.

179278225

Why have you changed the entirety of the metro tunnel level/layer to -4 without considering the impact of these edits? The levels at each station are: -2 at Anzac, -4 Town Hall, -3 State Library, -2 Parkville & -2 Arden. The track levels need to match these levels for the DTP maps and journey planning to work.

172430435

Thank you for reverting my accidental edit

170594158

There is no fence crossing Porter St?
Way: 1422963297
Version #1
Rebuilding tracks and stations from Elsternwick to South Yarra. (PLEASE NOTE) Only saving due to a map error which has caused all nodes and ways to disappear. I will be fixing everything that is unfinished or missing soon.

Edited 7 days ago by LachlanTansey2009
Changeset #170594158
0
Tags
barrier fence
material metal

168379220

What is this?

168378016

Why was the track 'relayed'?

168377595

Why were all these stations re-built?

168375818

What was this edit?

168375908

What is this edit?

168375964

Removing what?

164312377

Thanks for your feedback, but our transport software requires a psv=yes tag in some cases, in this case to match the south tag with the north tags.

159113453

Michelle this is a duplication of an existing path, so should be removed?