OpenStreetMap logo OpenStreetMap

Kevin67's Notes

Notes submitted or commented on by Kevin67

Id Creator Description Created at Last changed
5105000 Kevin67

Gravel track is blocked due to work construction zone for Yarra Valley Water Love Branch Sewer works. Date of completion is said to be April 2026. Expected access after this date is unknown.
https://www.yvw.com.au/faults-works/planned-works/works-my-area/love-branch-sewer-project

5005187 Kevin67

Construction has commenced on the Upfield Bike Path connection between the end of Sages Road and the M80 Ring Road Trail. Alignment is unknown to this author, but construction can be seen and has been publicised.

4894761 Kevin67

Previous roundabout has been replaced with a signalised cross road with slip lanes with yellow shared path crossings and with bicycle lanterns on shared path signalised crossings.

4894758 Kevin67

Shared Use Path (only partly signed) between Donnybrook Road and Mt Ridley Road crosses road in this location. To be added on side of road. Road alignment may be an issue.

4838057 Kevin67

Cloverton Boulevard bridge includes paths.

4804417 Kevin67

School bus stop

4874302 Kevin67

Brossard Road, both sides, appears to be open up to this point, with separated bike and foot path along it.

4874289 Kevin67

This road is open, for "left turn only" I believe.

4874288 Kevin67

Dryland Boulevard appears to be open, no barriers at all in the vicinity, drivers freely using it. Is it simply a matter of removing the "under construction" tag? Note there are also separated bike and foot paths along it (though a section of foot path is still missing).

4783176 Kevin67

Intersection is being upgraded. Unknown design. Unknown finish date. Presently some obstructions for paths from construction activity.