| 5356925 | InfiNorth | Boundary of Tribune Bay Park has changed. |
|||
| 5305367 | InfiNorth | New MUP is almost finished, connecting (annoyingly) to a pedestrian only crossing.. |
|||
| 4322638 | smithkm | Tagging Bastion Square as one big pedestrian area obscures the presence of many stairs and ramps connecting different parts of the square. |
|||
| 4734258 | InfiNorth | Multi-use path needs continuation to Green Bay Road based on onsite survey rather than imagery as imagery is not up to date. Please ensure that "bike lane mapped separately" is tagged in the cycleway for Boucherie Road. Confirmation of cycleway layout and configuration up to Ogden Road also needed. |
|||
| 5314896 | InfiNorth | District of Oak Bay's designated bike route plan for route 4.4a (central Oak Bay bikeway) is being relocated to Devon Road. This connector is not designated or designed for bikes. |
|||
| 5309368 | ShantiDam | "Moka House ( Coffee shop ) "
|
|||
| 5308191 | InfiNorth | Intersection is being redesigned and rebuilt somewhat during the Estevan/Haultain bikeway project. RRFBs have been removed but will be reinstalled. |
|||
| 5308180 | InfiNorth | Officially designated Henderson Bikeway RRFBs nearing completion, monitor this area over coming months for completion. |
|||
| 5216237 | InfiNorth | Will need resurvey and remap as cycle traffic is being separated from pedestrian traffic for the entire crossing including refuge islands on the east side of intersection. |
|||
| 4297959 | smithkm | https://www.saanich.ca/assets/Local~Government/Documents/Engineering/Cycling-%20Network.pdf Shows this as a cycle path |