188163296

Thanks for mapping the Aba 1000/500 kV substation! I had located the site before, but the available satellite imagery had not yet been updated to show the substation, so I couldn't map it reliably. Really glad to see someone finally add it and its basic topology. Nice work! 🐧

184126593

The Zhongning Converter Station is significantly misaligned with current satellite imagery and should be comprehensively remapped, including the station boundary, internal equipment layout, and associated line connections.

187594766

Outstanding work — a truly valuable contribution!

186833238

Great work, bro!

184500746

Great work, comrade. Just a small correction: the 35 kV line you mapped appears to be the substation’s auxiliary power supply, not a primary incoming supply. It should not be connected to the 330 kV busbar through a 330/35 kV transformer; in this context, that configuration is technically incorrect.

177285194

Để nhầm tên, nó nhảy chữ, sorry:))