EP2021's Notes
Notes submitted or commented on by EP2021
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 2914289 | someart13 | Please can you check this part of the road for changing speed limits? Drivers report about an incorrect speed limit! |
|||
| 4392187 | EP2021 | This park looks to be finished with lots of visitors attending Aug 18, 2024. I spotted outdoor toilet facilities (porta potties, both standard and wheelchair accessible). Paths will need to be drawn. Lots of POIs in this area! |
|||
| 5560538 | EP2021 | There's a new Food basics plaza here. The MUP/sidewalk on south side of Rossland is blocked. These buildings need to be added once the aerial maps are available. |
|||
| 5461599 | EP2021 | There should now be an MUP on the south side of Conlin from Grandview to the Mackie park area per city council member, but I have not seen it myself. If a local can confirm before I do, please add it to the map. |
|||
| 4969734 | EP2021 | A brand-new park, flower garden, and BMX park opened here. It's significant and includes a lot of POIs, including benches, bike racks, a public washroom, and rest areas. It's difficult to map without an updated satellite layer being available, but it will be a wonderful place to map. |
|||
| 5239611 | EP2021 | The Region will be doing some major work on Farewell in 2026, including building a multi-use path on the east side from Harbour St to the rail underpass. Lots of POIs and adjustments will need to be made to the map once the work is done. More info: https://apps.durham.ca/Applications/Works/PublicWorksProjects/projectdetails.aspx?project=4090 |
|||
| 5340277 | AntiFasZ | This location doesn't exist anymore. It was taken over, renamed "Legend of Fazios" then recently, as of June 2026, closed and currently is an empty building. #OsmAnd |
|||
| 3795430 | EP2021 | This area has been very recently (summer 2023) revamped to include a washroom facility. It's not on any aerial maps, so it will take some time to add it to OSM. These washrooms are quite large and accessible and allow for one occupant at a time (locked doors). You can easily fit a wheelchair, bike, stroller, etc. |
|||
| 5244089 | EP2021 | Massive reconstruction project between April 2026 to late 2027. This section of the map will need to be updated once the construction has been completed. Expect bike lanes and an MUP to be installed along Thorton. More details from the City of Oshawa: https://www.oshawa.ca/city-hall/major-construction-and-renewal-projects/#Northwood |
|||
| 4887077 | EP2021 | This section appears to now be fully paved, but not yet open to the public. I expect that will happen very soon. |