OpenStreetMap logo OpenStreetMap

BON2BOS's Notes

Notes submitted or commented on by BON2BOS

Id Creator Description Created at Last changed
307531 Ahlzen

Survey street name (not in Tiger2014)

4492834 BON2BOS

Parking deck here is torn down. There's a development underway here that is going to replace it.

4706019 BON2BOS

Atlantic Union College has closed

4525958 BON2BOS

Recent construction has added a shared-use-path that connects from Arsenal St to Coolidge Ave that runs near the parking garage

4644487

Some sort of cut-through path is present between Warren Ave and Riverside Dr

4492829 BON2BOS

Clipper City Rail Trail connects along Parker St through the rotary. Recent project extends the shared use path, and adds new crosswalks to cross Route 1.

4373413 BON2BOS

This park has gone under some recent renovations and the paths have changed.

4490081 BON2BOS

https://www.boston.gov/departments/transportation/north-beacon-street

New bike lane along N Beacon St

2888288 JesseFTW

Unable to answer "Do these steps have a handrail?" for way/640131235 via StreetComplete 34.1:

Bridge is closed because it has been demolished.

Attached photo(s):
https://westnordost.de/p/64333.jpg

4472769 BON2BOS

DCR will be widening the sidewalks/path here. The biggest change will be moving the street-level bike lane onto a wider shared-use path. The speed limit in this area will also be lowered to 25 mph. Just putting this note here to flag it as the work is estimated to be completed by late November.

Link to plans:
https://www.mass.gov/doc/dcr-memorial-dr-construction-plan-october-2024/download

Link to traffic notice from the DCR:
https://www.mass.gov/doc/dcr-traffic-advisory-safety-improvements-for-the-bu-bridge-corridor-of-memorial-drive-in-cambridge/download

Link to news article:
https://mass.streetsblog.org/2024/10/04/state-officials-say-work-to-improve-safety-at-lethal-memorial-drive-crash-site-will-begin-on-monday