Yes, I think this is a reasonably use of notes feature to keep progress of infrastructure works.
Construction work location is being established here now. Works apparently expected across the whole park area (between roads).
https://buvinzenierusavieniba.lv/ar-buvlaukuma-ierikosanu-saks-uzvaras-parka-atjaunosanu-riga/
Major construction is now underway all the way down to SE parking entrance. Looks like most of the North/Northeast paths will get rebuilt. Unsure about Southern footways.
Expected to be finished by 11 November.
https://www.lsm.lv/raksts/zinas/latvija/23.10.2023-riga-meginas-uzvaras-parka-parbuvi-pabeigt-lidz-lacplesa-dienai.a528722/
I should clarify, the first stage of two stages is expected by 11 November (originally ~23 November). 11 Nov is supposedly the opening date to match park's 100 years celebration. It's being rushed, so likely not going to have the full features at opening. Second stage to be completed next year.
Some large details already are mapped.
Partly open as of today. Lots of new amenities/POIs. A bit of it is updated on the map, although I am not sure it was from survey. Lots of new footways, boardwalks and misc here now. Unsure how well it matches official plans/documents.
https://www.lsm.lv/raksts/zinas/latvija/09.11.2023-lacplesa-diena-sabiedribai-atvers-atjaunoto-uzvaras-parku.a531061/
https://buvinzenierusavieniba.lv/izbuveta-un-labiekartota-uzvaras-parka-pirma-karta-jeb-ainaviska-dala
Next stage to have cafe zone, outdoor gym equipment and more greenery. Plus the previously-planned stuff, notably skate park and proper connections to existing footways.
https://buvinzenierusavieniba.lv/noskaidrotas-rigas-iedzivotaju-velmes-uzvaras-parka-labiekartosanai