Loading...
Node History: 4355582524
Version #5
power plant
- Edited by Olyon
- Changeset #109652855
- Location: 14.4769198, 121.3471579
Tags
generator:method | wind_turbine |
---|---|
generator:output:electricity | 2 MW |
generator:source | wind |
generator:type | horizontal_axis |
operator | Alternergy Wind One Corporation |
power | generator |
Version #4
unify tags wind_turbine
- Edited by maning
- Changeset #54973060
- Location: 14.4769198, 121.3471579
Tags
generator:method | wind_turbine |
---|---|
generator:source | wind |
generator:type | horizontal_axis |
operator | Alternergy Wind One Corporation |
power | generator |
Version #3
Update location of windmills
- Edited by maning
- Changeset #54945830
- Location: 14.4769198, 121.3471579
Tags
generator:method | wind_turbine |
---|---|
generator:source | wind |
generator:type | horizontal_axis |
name | Windmill |
operator | Alternergy Wind One Corporation |
power | generator |
Version #2
[Pililia, Rizal and Mabitac, Laguna] add Meralco 115 kV subtransmission line and missing tags on other windmills on Pililia Wind Farm, correct name of operator
- Edited by TagaSanPedroAko
- Changeset #44963318
- Location: 14.4767091, 121.3469269
Tags
generator:method | wind_turbine |
---|---|
generator:source | wind |
generator:type | horizontal_axis |
name | Windmill |
operator | Alternergy Wind One Corporation |
power | generator |
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |