Loading...
Changeset: 66442604
Map previously unmapped half of Wuhan-Shenzhen Expressway which opened on 2018-12-26 per http://www.ggj.hbjt.gov.cn/xwlm/gsyw/712870.htm using 2018-12-16 Sentinel-2 and convert the previously mapped half to open (still needs double-carriageway + links).
Closed by dbaron
Tags
Discussion
Ways (1-20 of 24)
- 1
- 2
- 664528592, v1
- 武汉-深圳高速公路 (664528593), v1
- 664528594, v1
- 武汉-深圳高速公路 (664528595), v1
- 武汉-深圳高速公路 (664528596), v1
- 664528597, v1
- 664528598, v1
- 武汉-深圳高速公路 (664528599), v1
- 武汉-深圳高速公路 (664528600), v1
- 武汉-深圳高速公路 (664528601), v1
- 武汉-深圳高速公路 (664528602), v1
- 武汉-深圳高速公路 (664528603), v1
- 武汉-深圳高速公路 (664528604), v1
- 武汉-深圳高速公路 (664528605), v1
- 武汉-深圳高速公路 (664528606), v1
- 664528607, v1
- 664528608, v1
- 664528609, v1
- 664528610, v1
- 武汉-深圳高速公路 (487779061), v2
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |