Way: 882696049
Version #28
progress update
Tags
construction | motorway_link |
---|---|
highway | construction |
lanes | 2 |
opening_date | 2025 |
status | AM,AC,builder:Webuild,progress:64.96%/01.04.2024 62.86%/29.02.2024 60.27%/31.12.2023 24.90%/31.12.2022 4.5%/15.12.2021 |
surface | asphalt |
Part of
2 relations
- Relation A1 Sibiu - Pitești (8331845)
- Relation PiSi - Lotul 5 (7397613)
Nodes
14 nodes