Loading...
Way: Sectiunea E2 (803396914)
Version #11
Expected Opening Date for Margina-Cosevita
- Edited by ErikTheEngineer
- Changeset #150891933
Tags
construction | motorway |
---|---|
highway | construction |
name | Sectiunea E2 |
oneway | yes |
opening_date | 2026 |
status | AM,builder:UMB,financing:PNRR |
Part of
2 relations
- Relation A1 Lugoj-Deva lot 2 (10541584)
- Relation A1 LD Lot 2E2 (7391165)
Nodes
2 nodes
- 6588288038 (part of way Sectiunea E1 (701522526))
- 6588288045 (part of way Sectiunea E2 (698737034))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |