Loading...
Way: Sectiunea E1 (698737037)
Version #21
Expected Opening Date for Margina-Cosevita
- Edited by ErikTheEngineer
- Changeset #150891933
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
layer | 1 |
name | Sectiunea E1 |
oneway | yes |
opening_date | 2026 |
status | AC,PTE,AM,builder:UMB,financing:PNRR |
Part of
2 relations
- Relation A1 Lugoj-Deva lot 2 (10541584)
- Relation A1 LD Lot 2E1 (10541490)
Nodes
14 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |