Way History: Autostrada Transilvania (621242155)
Version #45
Updating maxspeed tag in Romania #MSFTOpenMaps
Tags
bridge | yes |
---|---|
highway | motorway |
int_ref | E 60 |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
maxspeed:conditional | 80 @ wet |
name | Autostrada Transilvania |
oneway | yes |
ref | A3 |
smoothness | excellent |
start_date | 2023 |
status | AM,PTE,AC,progress:76.5%/20.11.2023 75%/20.10.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
surface_survey | 2023DEC_RobertH@peundemerg.ro |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #44
moved E 60 on the newly open motorway
- Edited by RobertH-PUM
- Changeset #145384102
Tags
bridge | yes |
---|---|
highway | motorway |
int_ref | E 60 |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania |
oneway | yes |
ref | A3 |
smoothness | excellent |
start_date | 2023 |
status | AM,PTE,AC,progress:76.5%/20.11.2023 75%/20.10.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
surface_survey | 2023DEC_RobertH@peundemerg.ro |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #43
Open for traffic
- Edited by RobertH-PUM
- Changeset #145370116
Tags
bridge | yes |
---|---|
highway | motorway |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania |
oneway | yes |
ref | A3 |
smoothness | excellent |
start_date | 2023 |
status | AM,PTE,AC,progress:76.5%/20.11.2023 75%/20.10.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
surface_survey | 2023DEC_RobertH@peundemerg.ro |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #42
Soon to be open (date expected : 21.12.2023)
- Edited by RobertH-PUM
- Changeset #145291358
Tags
access | no |
---|---|
bridge | yes |
highway | motorway |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania |
oneway | yes |
ref | A3 |
smoothness | excellent |
start_date | 2023 |
status | AM,PTE,AC,progress:76.5%/20.11.2023 75%/20.10.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
surface_survey | 2023DEC_RobertH@peundemerg.ro |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #41
update status
- Edited by RobertH-PUM
- Changeset #144246835
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2023 |
ref | A3 |
status | AM,PTE,AC,progress:76.5%/20.11.2023 75%/20.10.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #40
update progress
- Edited by RobertH-PUM
- Changeset #142888999
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2023 |
ref | A3 |
status | AM,PTE,AC,progress:75%/20.10.2023 60%/28.09.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #39
update progress
- Edited by RobertH-PUM
- Changeset #141863810
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2023 |
ref | A3 |
status | AM,PTE,AC,progress:60%/28.09.2023 43%/23.08.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #38
update progress
- Edited by RobertH-PUM
- Changeset #140334523
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2023 |
ref | A3 |
status | AM,PTE,AC,progress:43%/23.08.2023 32%/28.07.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #37
update progress
- Edited by RobertH-PUM
- Changeset #140276724
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM,PTE,AC,progress:43%/23.08.2023 32%/28.07.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #36
corected
- Edited by RobertH-PUM
- Changeset #140253911
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM,PTE,AC,progress:32%/28.07.2023 25%/27.06.2023 12%/01.05.2023 37.86%/11.03.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #35
update progress
- Edited by RobertH-PUM
- Changeset #139142747
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM,PTE,AC,progress:32%/28.07.2023 25%/27.06.2023 12%/01.05.2023 37.86%/01.04.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #34
update progress
- Edited by RobertH-PUM
- Changeset #137815164
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM,PTE,AC,progress:25%/27.06.2023 12%/01.05.2023 37.86%/01.04.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #33
update progress
- Edited by RobertH-PUM
- Changeset #136271200
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM,PTE,AC,progress:12%/01.05.2023 37.86%/01.04.2021,severance:Straco/11.03.2021,builder:Strabag |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #32
removed tender
- Edited by RobertH-PUM
- Changeset #128073902
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM/06.11.2017,PTE,AC,progress:37.86%/01.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,builder:Strabag & Geiger |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #31
Updated progress status of the motorway's constructuion. Also added scheduled opening date.
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2024 |
ref | A3 |
status | AM/06.11.2017,PTE,AC,progress:37.86%/01.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,tender:CN1033119/20.07.2021,builder:Strabag & Geiger |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #30
update status
- Edited by RobertH-PUM
- Changeset #124648626
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
ref | A3 |
status | AM/06.11.2017,PTE,AC,progress:37.86%/01.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,tender:CN1033119/20.07.2021,winner:Strabag & Geiger |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #29
update status
- Edited by RobertH-PUM
- Changeset #124645536
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
ref | A3 |
status | AM/06.11.2017,PTE,AC,progress:37.86%/01.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,tender:CN1033119/20.07.2021,winner:Drum Asfalt |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #28
corrected
- Edited by RobertH-PUM
- Changeset #108299596
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
ref | A3 |
status | AM/06.11.2017,PTE,AC,progress:37.86%/01.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,tender:CN1033119/20.07.2021 |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #27
corected
- Edited by RobertH-PUM
- Changeset #103348639
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
ref | A3 |
status | AC,progress:37.86%/01.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,AM/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #26
Update A3 2A lot 3 Chetani - Campia Turzii progress based on CNAIR reports
- Edited by rpristopan
- Changeset #102350972
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
ref | A3 |
status | AC,progress:37.86%/05.04.2021 37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,AM/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #25
corrected
- Edited by RobertH-PUM
- Changeset #100834272
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
ref | A3 |
status | AC,progress:37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,AM/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #24
contract reziliat
- Edited by RobertH-PUM
- Changeset #100834227
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,severance:Straco/11.03.2021,AM/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #23
simplify status
- Edited by RobertH-PUM
- Changeset #97861944
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:37.64%/15.12.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #22
A3
- Edited by ovidiuionut
- Changeset #96333859
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:37.64%/15.12.2020 37.17%/01.11.2020 36.87%/13.10.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #21
update status
- Edited by RobertH-PUM
- Changeset #95061661
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:37.17%/01.11.2020 36.87%/13.10.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #20
Update A3 2A lot 3 Chetani - Campia Turzii progress based on CNAIR reports
- Edited by rpristopan
- Changeset #92428588
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:36.87%/13.10.2020 33.85%/01.09.2020 31.84%/01.05.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #19
Update A3 lot 2A3 progress based on CNADNR reports
- Edited by rpristopan
- Changeset #90355379
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:33.85%/01.09.2020 31.88%/01.07.2020 31.84%/01.05.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #18
Update A3 lot 2A3 progress based on CNADNR reports
- Edited by rpristopan
- Changeset #88515493
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:32.76%/20.07.2020 31.88%/01.07.2020 31.84%/01.05.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #17
Update A3 lot 2A3 progress based on CNADNR reports
- Edited by rpristopan
- Changeset #87604849
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:31.88%/01.07.2020 31.84%/01.05.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #16
update status
- Edited by RobertH-PUM
- Changeset #85041957
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:31.84%/01.05.2020 31.18%/13.12.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #15
update to a more realistic date
- Edited by RobertH-PUM
- Changeset #83265511
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2022 |
ref | A3 |
status | AC,progress:31.18%/13.12.2019 29.46%/11.11.2019 28.51%/16.10.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #14
Update progress
- Edited by RobertH-PUM
- Changeset #78387910
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:31.18%/13.12.2019 29.46%/11.11.2019 28.51%/16.10.2019 18.52%/31.12.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #13
Update progress
- Edited by RobertH-PUM
- Changeset #76918440
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:29.46%/11.11.2019 28.51%/16.10.2019 27.97%/09.09.2019 27.79%/03.08.2019 26.85%/07.07.2019 24.97%/12.06.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #12
Status update
- Edited by RobertH-PUM
- Changeset #75783739
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:28.51%/16.10.2019 27.97%/09.09.2019 27.79%/03.08.2019 26.85%/07.07.2019 24.97%/12.06.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #11
Update status
- Edited by RobertH-PUM
- Changeset #74266329
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:27.97%/09.09.2019 27.79%/03.08.2019 26.85%/07.07.2019 24.97%/12.06.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #10
Update status
- Edited by RobertH-PUM
- Changeset #72973507
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:27.79%/03.08.2019 26.85%/07.07.2019 24.97%/12.06.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #9
Status update
- Edited by RobertH-PUM
- Changeset #71981599
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:26.85%/07.07.2019 24.97%/12.06.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #8
Update status
- Edited by RobertH-PUM
- Changeset #71186929
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:24.97%/12.06.2019 22.73%/19.04.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #7
Corrected
- Edited by RobertH-PUM
- Changeset #69578562
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:22.73%/19.04.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
- 4942801563 (part of way Autostrada Transilvania (83719399))
Version #6
Status update
- Edited by RobertH-PUM
- Changeset #69387005
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:22.73%/19.04.2019 22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
-
5868673745
Version #5
Update progress
- Edited by RobertH-PUM
- Changeset #68375926
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
status | AC,progress:22.11%/21.03.2019 18.52%/31.12.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
-
5868673745
Version #4
Actualizare progres Chetani-Campia Turzii
- Edited by RobertH-PUM
- Changeset #66129612
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
smoothness | excellent |
status | AC,progress:18.52%/31.12.2018 16.88%/01.09.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
-
5868673745
Version #3
updated status progress
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2020 |
ref | A3 |
smoothness | excellent |
status | AC,progress:16.88%/01.09.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
-
5868673745
Version #2
updated status progress
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2019 |
ref | A3 |
smoothness | excellent |
status | AC,progress:16.88%/01.09.2018 15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
-
5868673745
Version #1
updated bridges
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 130 |
name | Autostrada Transilvania, 2A, lot 3 Chetani -Campia Turzii |
oneway | yes |
opening_date | 2019 |
ref | A3 |
smoothness | excellent |
status | AC,progress:15.30%/01.08.2018 5%/10.11.2017,builder:Straco,AM:5/06.11.2017,PTE |
surface | asphalt |
Nodes
2 nodes
- 346773672 (part of way Autostrada Transilvania (621242157))
-
5868673745
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |