Loading...
Way: 551385312
Version #3
planned electrification to Kokand: https://asiaplustj.info/ru/news/tajikistan/economic/20210310/tadzhikistan-i-uzbekistan-elektrifitsiruyut-zheleznuyu-dorogu-bekabad-kanibadam-kokand
Tags
bridge | yes |
---|---|
electrified | no |
gauge | 1520 |
layer | 1 |
passenger_lines | 1 |
proposed:electrified | contact_line |
proposed:frequency | 50 |
proposed:voltage | 25000 |
railway | rail |
usage | main |
Nodes
2 nodes
- 271655065 (part of way 551385311)
- 5325053737 (part of way 551385313)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |