Loading...
Way: 24317379
Version #34
re-opened Forth & Clyde Canal towpaths that were closed to allow construction of Stockingfield Bridge. Paths re-opened this morning 08 Aug 2022. Stockingfield Bridge will open in autumn.
- Edited by Ossian Lore
- Changeset #124647277
Tags
access | yes |
---|---|
bicycle | yes |
description | Closed until ~July 2022 https://www.scottishcanals.co.uk/news/stockingfield-bridge-works-updates/ |
est_width | 2 |
foot | yes |
highway | footway |
lit | no |
motor_vehicle | no |
surface | asphalt |
Part of
1 relation
- Relation NCN National Route 754 (51479)
Nodes
10 nodes
- 29006140 (part of ways 123747254, Lochburn Road (28216075), and Lochburn Road (28401685))
- 9020443014
- 9015751981
- 1378944830
- 9015751980
- 9012794136 (part of way 974174197)
- 9015751979
- 9015751978
- 9015751977 (part of way 974174216)
- 9012794140 (part of ways Forth and Clyde Canal Glasgow Spur Towpath (161532530) and Forth and Clyde Canal Glasgow Spur Towpath (974400735))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |