Way History: Rheinbahn (188659601)
Version #19
Rheinbahn hat 200. In Deutschland ist alles ab 160 Hochgeschwindigkeit
- Edited by GruenerOjama2
- Changeset #106468431
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
importance | national |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #18
Revert changesets 49732988 to 49733684 by user Negjana. This was an undiscussed mechanical edit. Please read the Automated Edits Code of Conduct. It explains what to do to reduce the risk that your mechanical edits get reverted.
- Edited by Nakaner-repair
- Changeset #49755317
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
importance | national |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #17
nobody needs highspeed=no, please do NOT use it
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
importance | national |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #16
Korrektur Gleisanzahl
- Edited by t160728c035144
- Changeset #42019392
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
importance | national |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #15
Passenger Lines
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
importance | national |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
passenger_lines | 4 |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #14
Set importance=national for more TGV lines
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
importance | national |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #13
Streckennummern und -Daten im Bereich Westpfalz/Rheinbahn
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
meter_load | 8.0 |
name | Rheinbahn |
operator | DB Netz AG |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | passenger |
ref | 4020 |
ref:La | 2 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #12
some railway details Karlsruhe - Waghäusel
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
name | Rheinbahn |
operator | DB Netz |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
ref | 4020 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 3558135648
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #11
EC Hamburg–Zürich: Abschnitt Dortmund–Essen ergänzt. Tagging-Fixes (priority entfernt, name -> railway:track_ref)
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
name | Rheinbahn |
operator | DB Netz |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
ref | 4020 |
start_date | 1895 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
6 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #10
updates after railway and platform renovations between Graben-Neudorf and Karlsruhe
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
last_renovation | 2014-09 |
lit | no |
maxspeed | 200 |
name | Rheinbahn |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
ref | 4020 |
start_date | 1895 |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
6 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #9
railway details Rheinbahn Mannheim - Karlsruhe
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
lit | no |
maxspeed | 200 |
name | Rheinbahn |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:bidirectional | regular |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
ref | 4020 |
start_date | 1895 |
temporary:construction | rail |
temporary:date_off | 2014-09-14 |
temporary:date_on | 2014-07-31 |
temporary:note | Gleiserneuerung Karlsruhe - Graben-Neudorf |
temporary:railway | construction |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
6 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #8
railway details between Karlsruhe and Waghäusel
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
lit | no |
maxspeed | 200 |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
temporary:construction | rail |
temporary:date_off | 2014-09-14 |
temporary:date_on | 2014-07-31 |
temporary:note | Gleiserneuerung Karlsruhe - Graben-Neudorf |
temporary:railway | construction |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
6 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 2958288417
- 934791824 (part of way Rheinbahn (247414291))
Version #7
railway details between Karlsruhe and Graben-Neudorf
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
lit | no |
maxspeed | 200 |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
temporary:construction | rail |
temporary:date_off | 2014-09-14 |
temporary:date_on | 2014-07-31 |
temporary:note | Gleiserneuerung Karlsruhe - Graben-Neudorf |
temporary:railway | construction |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
5 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 934791824 (part of way Rheinbahn (247414291))
Version #6
railway and building details
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
lit | no |
maxspeed | 200 |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
5 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 934791824 (part of way Rheinbahn (247414291))
Version #5
railway details in Karlsruhe
Tags
detail | track |
---|---|
electrified | contact_line |
embankment | yes |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
lit | no |
maxspeed | 200 |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
6 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 2472329199
- 934791824 (part of way Rheinbahn (247414291))
- 934791823 (part of way Rheinbahn (247414291))
Version #4
railway details
Tags
detail | track |
---|---|
electrified | contact_line |
embankment | yes |
frequency | 16.7 |
gauge | 1435 |
highspeed | no |
lit | no |
maxspeed | 200 |
operator | DB Netz |
power:type | overhead |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
5 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 934791824 (part of way Rheinbahn (247414291))
- 934791823 (part of way Rheinbahn (247414291))
Version #3
railway details
Tags
detail | track |
---|---|
electrified | contact_line |
embankment | yes |
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
lit | no |
maxspeed | 200 |
operator | DB Netz |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | yes |
railway:pzb | yes |
railway:traffic_mode | passenger |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
5 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 934791824 (part of way Rheinbahn (247414291))
- 934791823 (part of way Rheinbahn (247414291))
Version #2
railway routes and corrections
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
lit | no |
maxspeed | 200 |
operator | DB Netz |
railway | rail |
railway:lzb | yes |
railway:traffic_mode | passenger |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
5 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 934791824 (part of way Rheinbahn (247414291))
- 934791823 (part of way Rheinbahn (247414291))
Version #1
railway fixing
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
lit | no |
maxspeed | 200 |
operator | DB Netz |
railway | rail |
railway:lzb | yes |
railway:traffic_mode | passenger |
tracks | 1 |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
5 nodes
- 42 W61 (693737473) (part of ways Güterumgehungsbahn Karlsruhe (582367143) and Rheinbahn (309250637))
- 1956431677
- 934791827
- 934791824 (part of way Rheinbahn (247414291))
- 934791823 (part of way Rheinbahn (247414291))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |