Way History: Strada Suișului (161869507)
Version #13
DN19 downgrade due to DX11 opening
- Edited by AcrobaticCell
- Changeset #148907329
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | primary |
int_ref | E 671 |
lanes | 1 |
maxspeed | 50 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | excellent |
start_date | 2020 |
status | AC,progress_estimate:98%/18.06.2020 90%/02.06.2020 70%/08.03.2020 35%/20.04.2019,builder:Drum Asfalt SRL |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
4 nodes
- 1860571837 (part of way DN19 (175473726))
- 9957986984
- 9957986985 (part of way Largire drum Oradea - Centura Biharia la 2x2 benzi (1196256235))
- 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #12
Mapped separately sidewalk and bike path from express road; aligned roads
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 1 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | excellent |
start_date | 2020 |
status | AC,progress_estimate:98%/18.06.2020 90%/02.06.2020 70%/08.03.2020 35%/20.04.2019,builder:Drum Asfalt SRL |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
4 nodes
- 1860571837 (part of way DN19 (175473726))
- 9957986984
- 9957986985 (part of way Largire drum Oradea - Centura Biharia la 2x2 benzi (1196256235))
- 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #11
Corrected tags
- Edited by RobertH-PUM
- Changeset #130996586
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 1 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | excellent |
start_date | 2020 |
status | AC,progress_estimate:98%/18.06.2020 90%/02.06.2020 70%/08.03.2020 35%/20.04.2019,builder:Drum Asfalt SRL |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
5 nodes
- 1860571837 (part of way DN19 (175473726))
- 9957986984
- 9957986985 (part of way Largire drum Oradea - Centura Biharia la 2x2 benzi (1196256235))
-
9957986986 - 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #10
I adjusted existing geometry to match imagery. #Kaart 2022
- Edited by GbabethemapGod
- Changeset #124992321
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 1 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
opening_date | 2020 |
ref | DN19 |
smoothness | excellent |
start_date | 2020 |
status | AC,progress_estimate:98%/18.06.2020 90%/02.06.2020 70%/08.03.2020 35%/20.04.2019,builder:Drum Asfalt SRL |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
5 nodes
- 1860571837 (part of way DN19 (175473726))
- 9957986984
- 9957986985 (part of way Largire drum Oradea - Centura Biharia la 2x2 benzi (1196256235))
-
9957986986 - 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #9
corrected
- Edited by RobertH-PUM
- Changeset #88507898
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 1 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
opening_date | 2020 |
ref | DN19 |
smoothness | excellent |
start_date | 2020 |
status | AC,progress_estimate:98%/18.06.2020 90%/02.06.2020 70%/08.03.2020 35%/20.04.2019,builder:Drum Asfalt SRL |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
2 nodes
- 1860571837 (part of way DN19 (175473726))
- 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #8
Added details about newly opened road
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 1 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
opening_date | 2020 |
ref | DN19 |
smoothness | excellent |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
2 nodes
- 1860571837 (part of way DN19 (175473726))
- 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #7
Opened Express road in Oradea
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 2 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
opening_date | 2020 |
ref | DN19 |
smoothness | excellent |
status | AC,progress_estimate:98%/18.06.2020 90%/02.06.2020 70%/08.03.2020 35%/20.04.2019,builder:Drum Asfalt SRL |
surface | asphalt |
surface_survey | 2020JUN_RobertH@peundemerg.ro |
Nodes
2 nodes
- 1860571837 (part of way DN19 (175473726))
- 1738287435 (part of ways 1156083426, Strada Suișului (161869509), and Strada Suișului (161869510))
Version #6
added roundabout
- Edited by RobertH-PUM
- Changeset #86632701
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 2 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | good |
surface | asphalt |
surface_survey | 8OCT2011 tudOr@motociclism.ro |
Nodes
2 nodes
Version #5
corrected
- Edited by RobertH-PUM
- Changeset #86093164
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 2 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | good |
surface | asphalt |
surface_survey | 8OCT2011 tudOr@motociclism.ro |
Nodes
3 nodes
Version #4
adjusted roundabout + corrected road geometry + splitted ways + added destination information in Bihor county, Romania #Kaart-370
- Edited by Armin Gheorghina
- Changeset #72711481
Tags
destination | Satu Mare |
---|---|
destination:int_ref | E671 |
destination:ref | DN19 |
highway | trunk |
int_ref | E 671 |
lanes | 2 |
maxspeed | 30 |
name | Strada Suișului |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | good |
surface | asphalt |
surface_survey | 8OCT2011 tudOr@motociclism.ro |
Nodes
2 nodes
Version #3
Corectii Oradea
Tags
highway | trunk |
---|---|
int_ref | E 671 |
lanes | 2 |
maxspeed | 30 |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | good |
surface | asphalt |
surface_survey | 8OCT2011 tudOr@motociclism.ro |
Nodes
2 nodes
Version #2
Routes européennes
Tags
highway | trunk |
---|---|
int_ref | E 671 |
lanes | 2 |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | good |
surface | asphalt |
surface_survey | 8OCT2011 tudOr@motociclism.ro |
Nodes
2 nodes
Version #1
Added a POI (supermarket), fixed road naming and added a roundabout.
- Edited by Ovi Indrei
- Changeset #11479697
Tags
highway | trunk |
---|---|
int_ref | E671 |
lanes | 2 |
nat_ref | DN19 |
oneway | yes |
ref | DN19 |
smoothness | good |
surface | asphalt |
surface_survey | 8OCT2011 tudOr@motociclism.ro |
Nodes
2 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |