Loading...
Way: East Coast Main Line (151171783)
Version #12
Added ETCS to the Hertford Loop since it was where ETCS was trialled for the ECML Digital Project with 313121
- Edited by A Trainspotter from Berkshire
- Changeset #131826412
Tags
electrified | contact_line |
---|---|
frequency | 50 |
gauge | 1435 |
maxspeed | 75 mph |
name | East Coast Main Line |
passenger | yes |
passenger_lines | 4 |
railway | rail |
railway:etcs | 2 |
ref | ECM1 |
source:electrified | observation |
track_detail | yes |
usage | main |
voltage | 25000 |
Part of
7 relations
- Relation Great Northern: Kings Lynn → London King's Cross (6370467)
- Relation Great Northern: Ely → London King's Cross (16179431)
- Relation Great Northern: Peterborough → London King's Cross (6368113)
- Relation East Coast Relief Line (11037499)
- Relation Thameslink: Cambridge → Brighton (17541294)
- Relation Thameslink: Peterborough → Horsham (17541371)
- Relation Great Northern: Cambridge → London King's Cross (ordinary) (6370443)
Nodes
12 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |