Loading...
Way: Nürnberg–Bamberg (1232800610)
Version #1
Bauzustand aktualisiert, Strecke 5900/5919, Forchheim - Eggolsheim
Tags
check_date | 2021-03-07 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
name | Nürnberg–Bamberg |
operator | DB Netz |
passenger_lines | 2 |
railway | rail |
railway:ballastless | no |
railway:etcs | no |
railway:lzb | no |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
ref | 5919 |
usage | main |
voltage | 15000 |
Part of
2 relations
Nodes
3 nodes
- 9687551225 (part of ways Nürnberg–Bamberg (914439098) and 1054154348)
- 9687551223
- 8494506171 (part of way Nürnberg–Bamberg (914433788))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |