Way History: Obere Neckarbahn (116067704)
Version #16
Gleiskosmetik
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Obere Neckarbahn |
operator | DB Netz |
passenger_lines | 2 |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikidata | Q105237208 |
wikipedia | de:Gäubahn |
workrules | DE:EBO |
Nodes
20 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 10537958222
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 7885155928
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #15
Wikidata-Kennungen importiert
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Obere Neckarbahn |
operator | DB Netz |
passenger_lines | 2 |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikidata | Q105237208 |
wikipedia | de:Gäubahn |
workrules | DE:EBO |
Nodes
19 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 7885155928
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #14
railway details Horb
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Obere Neckarbahn |
operator | DB Netz |
passenger_lines | 2 |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
workrules | DE:EBO |
Nodes
19 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 7885155928
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #13
Obere Neckarbahn
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Obere Neckarbahn |
operator | DB Netz |
passenger_lines | 2 |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
workrules | DE:EBO |
Nodes
18 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #12
Bahndetails konsolidiert Horb
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
operator | DB Netz |
passenger_lines | 2 |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
Nodes
18 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #11
passenger-lines
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
operator | DB Netz |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | Bing;extrapolation |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
Nodes
18 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #10
Landnutzung bei Horb
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
operator | DB Netz |
rack | no |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | Bing;extrapolation |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
Nodes
18 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
- 3892539394
- 3892539589
- 1309827634
- E (3892539767)
- 3892539772
- 3892539800
- 3892539820
- 3892539840
- 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #9
Eisenbahndetails zwischen Horb und Neckarhausen incl Korrekturen ehem Gbf Horb
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Gäubahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:bidirectional | signals |
railway:etcs | no |
railway:gnt | zub122 |
railway:preferred_direction | forward |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | Bing;extrapolation |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
Nodes
29 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 3892539364
- 3892539367
- 3892539369
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
- 3892539372
-
3892539373 - 3892539394
-
1309827664 - 3892539589
- 1309827634
-
2139368984 -
3892539656 - E (3892539767)
- 3892539772
-
2139368990 - 3892539800
-
3892539806 -
3892539816 - 3892539820
-
3892539825 -
1309827699 -
1309827659 - 3892539840
-
3892539842 - 100 (1309827721) (part of way 385916002)
- Ks 16 (3892539844)
- 65 (2139369003) (part of way 203934464)
- 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
Version #8
Fix wikipedia links
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
name | Gäubahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | Bing;extrapolation |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Stuttgart–Hattingen |
Nodes
22 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
-
1309827698 -
1309827664 - 1309827634
-
2139368984 -
2139368990 -
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 - 65 (2139369003) (part of way 203934464)
-
1309827682 -
2139369006 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
- 2498941124 (part of way 4860 (389097247))
-
1309914072 - 2139369013 (part of way 4860 (389097247))
-
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #7
normalized operator DB Netz
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
name | Gäubahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | Bing;extrapolation |
usage | main |
voltage | 15000 |
wikipedia:de | Bahnstrecke Stuttgart–Hattingen |
Nodes
22 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
-
1309827698 -
1309827664 - 1309827634
-
2139368984 -
2139368990 -
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 - 65 (2139369003) (part of way 203934464)
-
1309827682 -
2139369006 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
- 2498941124 (part of way 4860 (389097247))
-
1309914072 - 2139369013 (part of way 4860 (389097247))
-
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #6
Obere Neckarbahn, Ammertalbahn: Streckenkategorie, DS100
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
name | Gäubahn |
operator | DB Netz AG |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | Bing;extrapolation |
usage | main |
voltage | 15000 |
wikipedia:de | Bahnstrecke Stuttgart–Hattingen |
Nodes
22 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
-
1309827698 -
1309827664 - 1309827634
-
2139368984 -
2139368990 -
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 - 65 (2139369003) (part of way 203934464)
-
1309827682 -
2139369006 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
- 2498941124 (part of way 4860 (389097247))
-
1309914072 - 2139369013 (part of way 4860 (389097247))
-
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #5
Gleise im Bahnhof Horb korrigiert und ergänzt
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
railway | rail |
source | Bing;extrapolation |
voltage | 15000 |
Nodes
22 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
-
1309827698 -
1309827664 - 1309827634
-
2139368984 -
2139368990 -
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 - 65 (2139369003) (part of way 203934464)
-
1309827682 -
2139369006 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
- 2498941124 (part of way 4860 (389097247))
-
1309914072 - 2139369013 (part of way 4860 (389097247))
-
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #4
Baden-Württemberg: Gäubahn 2. Gleis Abschnitt Horb-Neckarhausen
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
railway | rail |
source | Bing;extrapolation |
voltage | 15000 |
Nodes
21 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
-
1309827698 -
1309827664 - 1309827634
-
2139368984 -
2139368990 -
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 - 65 (2139369003) (part of way 203934464)
-
1309827682 -
2139369006 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
-
1309914072 - 2139369013 (part of way 4860 (389097247))
-
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #3
(Bos) railway tagging refinements
- Edited by vwistuttgart
- Changeset #8628751
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
railway | rail |
source | Bing;extrapolation |
voltage | 15000 |
Nodes
16 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
- 224 (1349124546) (part of ways 385915972 and Gäubahn (120291481))
-
1309827698 -
1309827664 - 1309827634
-
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 -
1309827682 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
-
1309914072 -
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #2
railway
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
railway | rail |
source | Bing;extrapolation |
voltage | 15000 |
Nodes
15 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
-
1309827698 -
1309827664 - 1309827634
-
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 -
1309827682 - 70 (1309914114) (part of ways Obere Neckarbahn (116073170) and 4860 (389097247))
-
1309914072 -
1309914158 - 1309914094 (part of way 4860 (389097247))
- 1309914233 (part of way Gäubahn (385916019))
- 1260959257 (part of way Gäubahn (385916019))
Version #1
railway
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
railway | rail |
source | Bing;extrapolation |
voltage | 15000 |
Nodes
9 nodes
- 227 (1309827711) (part of ways Obere Neckarbahn (385916024) and 4860 (385916022))
-
1309827698 -
1309827664 - 1309827634
-
1309827699 -
1309827659 - 100 (1309827721) (part of way 385916002)
-
1309827657 -
1309827682
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |