OpenStreetMap

CycleStreets's notes

Notes submitted or commented on by CycleStreets

« Previous | Page 1 | Next »

Id Creator Description Created at Last changed
closed 234669 Richard

Cycle Superhighway (CS2x) is currently mapped with on-road tracks (cycleway=track) which is a suboptimal solution. Should be replaced with a separate highway=cycleway to recognise segregated nature of route.

over 2 years ago 13 days ago
open 795700 CycleStreets

This path, and the related sections, are marked as a footway. Are bicycles permitted to use it?

Ce chemin, ainsi que les sections correspondantes, sont marqués comme un passage à pied. Les bicyclettes sont-elles autorisées à l'utiliser?

15 days ago 15 days ago
open 795699 CycleStreets

These steps are not connected to anything. Do they provide a route down to the path by the river?

Ces étapes ne sont pas connectées à quoi que ce soit. Fournissent-ils un itinéraire vers le bas pour le chemin par la rivière?

15 days ago 15 days ago
open 795698 CycleStreets

This long path is marked as a 'Service road'. Is that correct?

Il s'agit d'une «route de service». Est-ce correct?

15 days ago 15 days ago
open 780521 CycleStreets

This section has some contradictory tagging - it says bicycle=yes but access=private.

As a result, routes are showing up like this:
https://www.cyclestreets.net/journey/55840479/

28 days ago 27 days ago
closed 641217 CycleStreets

Need to check cycle tracks at these two junctions due to the construction work.

5 months ago about 1 month ago
closed 715082 CycleStreets

This is marked as access=destination, meaning it is not possible as a through route for bicycles from the main road to the cycleway. Is that correct?

Dies wird als access=destination markiert, was bedeutet es für Fahrräder von der Hauptstraße zum Fahrradweg nicht möglich, da eine durchgehende Strecke ist. Ist das richtig?

3 months ago 2 months ago
closed 641214 CycleStreets

Does this bridge now have segregated lanes on?

5 months ago 3 months ago
open 699055 CycleStreets

Disconnected end of a cycle route - where does this start? Does it join to the terminal properly?

3 months ago 3 months ago
open 699054 CycleStreets

Pedestrian and cycle routability is very poor in this area - there are misconnected sections, and access=private (which seems odd). Satellite imagery would enable some of this to be corrected, but not all.

3 months ago 3 months ago

« Previous | Page 1 | Next »