CycleStreets's notes

Notes submitted or commented on by CycleStreets

« Previous | Page 1 | Next »

Id Creator Description Created at Last changed
closed 715082 CycleStreets

This is marked as access=destination, meaning it is not possible as a through route for bicycles from the main road to the cycleway. Is that correct?

Dies wird als access=destination markiert, was bedeutet es für Fahrräder von der Hauptstraße zum Fahrradweg nicht möglich, da eine durchgehende Strecke ist. Ist das richtig?

about 1 month ago 19 days ago
closed 641214 CycleStreets

Does this bridge now have segregated lanes on?

3 months ago about 1 month ago
open 699055 CycleStreets

Disconnected end of a cycle route - where does this start? Does it join to the terminal properly?

about 2 months ago about 2 months ago
open 699054 CycleStreets

Pedestrian and cycle routability is very poor in this area - there are misconnected sections, and access=private (which seems odd). Satellite imagery would enable some of this to be corrected, but not all.

about 2 months ago about 2 months ago
closed 567539 CycleStreets

There is a pedestrian exit somewhere round here, as per this photo:

5 months ago 2 months ago
closed 567541 CycleStreets

Ditto, link somewhere near here.

5 months ago 2 months ago
closed 641220 CycleStreets

Should this back street really be considered highway=service?

3 months ago 2 months ago
open 675912 CycleStreets

Don't remember seeing this path - needs checking.

2 months ago 2 months ago
closed 592950 CycleStreets

Many of the components of this subway (including the connecting footways and ramps) are marked with bicycle=no which seems very extreme.

Feedback from a user has suggested that it is possible to take a bike through this subway - either by riding or wheeling the bike.

4 months ago 2 months ago
open 641217 CycleStreets

Need to check cycle tracks at these two junctions due to the construction work.

3 months ago 3 months ago

« Previous | Page 1 | Next »