Works here are due to be completed very soon (mid May IIRC - nothing visible from "The Downs"), but unable to see where the rails have been laid - certainly nothing between Ruddington Lane and Clifton Blvd (looks like it's all ready for rails and ballast though).
A number of public footpaths and some open space is also supposed to be opening here too.
The rails have now been laid between the bridge and bend near A52. Unable to see from Wilwell Cutting NR if the cross over was down. The footpaths look to be complete at the western edge of the site, and are waiting the top surface at the eastern end (but remain inaccessible). No rails between the start of the curve and Ruddington Lane.
Some of the North Bound tracks are now in the process of being laid at the Ruddington Lane end, with the south bound being laid over the bridge