Loading...
Way: 300 (678184751)
Version #35
update progress
- Edited by RobertH-PUM
- Changeset #146954261
Tags
construction:railway:etcs | 2 |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
maxspeed | 100 |
name | 300 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:Aktor / Alstom,progress:24.58%/31.01.2024 24.15%/21.12.2023 19.28%/01.12.2022 11.6%/31.12.2021 |
usage | main |
voltage | 25000 |
Part of
3 relations
- Relation 300 (3432780)
- Relation Trasee vechi Brasov - Apata (9416581)
- Relation Reabilitare lot 1 Brasov - Apata (9416122)
Nodes
7 nodes
- 2921197017 (part of ways 300 (22700660) and CFR line 300 - Variant 1 - Feldioara (288569171))
- 2149446000 (part of way 204967403)
- 1893632821
- 7501455785
- 5931373356 (part of way 204967395)
- 7501455787
- 1893608031 (part of way 300 (179018531))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |