Loading...
Way: Southern Beltway (626289369)
Version #1
PA Turnpike 576 construction (section 55C1-1 to 55C2-2)
Tags
fut_ref | PA 576 |
---|---|
fut_ref:penndot | SR 7576 |
highway | proposed |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To remain highway=proposed until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
proposed | motorway |
proposed:surface | concrete |
ref | PA Tpke 576 |
sidewalk | no |
Part of
1 relation
- Relation PA Turnpike 576 (930949) (as west)
Nodes
10 nodes
- 19 (5912719292) (part of ways Southern Beltway (626289357) and 626289408)
- 5912720723
- 5912720722
- 5912720721
- 5912720720
- 5912720719
- 5912720718
- 5912720717
- 5912720716
- 5912719054 (part of way Southern Beltway (626289364))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |