Loading...
Way: Craigmore Viaduct (396447742)
Version #7
Updated GNR Main up to Portadown. Translink's network statement says line speed is 90mph on unspecified segments, and is otherwise 70mph, which I've defaulted to. I'm sure there's sections slower than 70mph too I can't map.
Tags
bridge | viaduct |
---|---|
bridge:name | Craigmore Viaduct |
electrified | no |
gauge | 1600 |
layer | 2 |
maxspeed | 70 mph |
name | Craigmore Viaduct |
note | The Bing satellite images are grossly distorted |
operator | Translink NI Railways |
passenger | international;regional |
passenger_lines | 2 |
railway | rail |
railway:aws | yes |
railway:tpws | true |
railway:track_ref | Up Main Line |
railway:traffic_mode | passenger |
ref | D |
usage | main |
wikidata | Q17779593 |
Part of
2 relations
- Relation Belfast-Newry (275874)
- Relation Enterprise Belfast - Dublin (16344723)
Nodes
6 nodes
- 3992500090 (part of ways 924841519 and Great Northern Railway Main Line (396454863))
- 3992500091
- 3992500092
- 3992500093
- 3992500094
- 3992500095 (part of ways 924841519 and Great Northern Railway Main Line (396446736))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |