Loading...
Way: Тёплая Гора (287462706)
Version #9
ЛЭП 110 и 35 кВ - куст подстанции Цемент
- Edited by leksandrych
- Changeset #144500295
Tags
barrier | wall |
---|---|
location | outdoor |
name | Тёплая Гора |
operator | Свердловская дирекция инфраструктуры АО «РЖД» |
power | substation |
rating | 23.5 MVA |
substation | traction |
voltage | 110000;6000 |
Nodes
7 nodes
- 2910596258
- 2910596259
- 3779133674 (part of way 374518074)
- 2910596246 (part of ways 287663989 and 287663989)
- 2912347113 (part of way 287663989)
- 2910596247
- 2910596258
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |