fiixed lane counts and added lane specifications
added street lamps and fire hydrants
moved position of bus stop platform
removed pedestrian lights used during construction
fixed streets not being connected correctly
added steps and adjusted step count
fixed layring issues with stream and roads
fixed incorrect/missing width restrictions
specified traffic signals to be pedestrian crossings