atd substation, squaring of substation/industrial area
dpts-su2, ats-atd-blts, updated blts-bmh 66kv power lines
yaloak south wind farm substation, overhead lines and added tags to turbines
crowlands wind farm substations, overhead lines and turbines
completion of ararat wind farm, ararat terminal station and associated power lines
dpts-su1, updated kts-sse1 and removed kts-su
latham/belconnen ZS switchyard updates
murrumbateman substation, 132kV lines to it, and 330kV lines to canberra alignment
canberra/lower tumut line alignment
queanbeyan canberra 132kV lines, sutton 66kV line and substation
googong dam 66kV, return from queanbeyan s to queanbeyan 66kV
queenbeyan sth/fyshwick substations and 66kV lines, alignments of roads nearby transmission lines
fixed self intersecting way errors in substations where required
tennent, queanbeyan and googong town substations, 132kV lines between them
cooma/williamsdale 132kV lines and williamsdale switchyard