Bridge has been closed for renovation since 26/09/2022 and is scheduled to reopen by 30/06/2022. No pedestrian or vehicular access of any type. At time of surveying bridge surface has been totally removed and only the bridge supports remain.
-
Updated details of Place de l'Europe car park
-
Rue Aigner is two-way since June 2022. Road markings now reflect this, also the junction with Rue de Gasperi has the relevant markings
-
Converted shared pedestrian/cycle path to pedestrian only on east side of Rue Erasme. Added two-way cycle only track on same side of Rue Erasme, also a cycle-only path at the roundabout with Rue Alcide de Gasperi and Rue Leon Hengen. Includes small link p
-
Removed a track which is overgrown.
-
Added features and details around Belmont Demesne
-
Added forest path surveyed on foot.
-
Changed Match supermarket to ALDI, included opening hours. Added local path and abandonded building
-
Added building under construction
-
Road reduced to one lane northbound since June 2022
-
Removed two forest tracks. They are overgrown and in several places are blocked by fallen trees. Little evidence of recent use by humans or animals.
-
Added gates to school Larochette.
-
Added inaccessible bridge over river in Larochette
-
Added outdoor seating area.
-
Added underground pumping station and gravel access area.
-
Reclassified area in Dommeldange as a construction site.
-
Added gate to Bridle Path on Newcourt Road
-
Added gate to Bridle Path on Newcourt Road
-
Adjusted footpaths on approach to Bray Head. They do not connect with the farm access road and that area is indeed fenced off.
-
Added Headlands allotments