-
added proposed ETCS construction Alameda–Melipilla (61 km) and Santiago–Batuco (26 km)
Closed
-
marked possibly outdated railway route planning
Closed
-
added railway speed limit
Closed
-
added footways on square to enable routing
Closed
-
Specify road smoothness
Closed
-
Specify which way leads up for steps
Closed
-
Specify paths smoothness
Closed
-
Specify road smoothness
Closed
-
Specify road surfaces
Closed
-
Specify road surfaces
Closed
-
Specify road smoothness
Closed
-
Specify road smoothness
Closed
-
Specify path surfaces
Closed
-
Survey whether benches have backrests
Closed
-
corrected location of paths
Closed
-
Determine roads lane count
Closed
-
Specify whether there are cycleways
Closed
-
Specify road surfaces
Closed
-
Specify road smoothness
Closed
-
Specify road smoothness
Closed