added footpath connecters to blossom hill station
added footpath connecters to parma cr/wakunda pl
Added footpaths to UNC Charlotte LYNX station
added bike permissions to waterfront path/bridge
updated gate permission to allow foot traffic
added platforms to lincoln station
Added connector between bus terminal and path to train station
Added crosswalk at South Boyle
Adjusted paths to VTA platform
Added footpath bridge over Circle Drive
Added walk/bike permissions to the gate
added foopaths to connect bus stop on markham ave with the residential neighbourhood
added path from San Rafael to Gordon head
Added footpaths around Bombardier completion center
Added rail crossings to Lutherville station.
Added footpath to Norwalk Station
Added platform to Norwalk Station