Eddington: realign some features to mid-2023 Bing aerials
Refactor Block 2B as a single building with two building:parts
This phone mast is now gone, presumably supplanted by the newer one nearby
typo in Quadrant flats numbering
Marleigh south construction update
Construction update, Marleigh north
Construction seems basically complete around The Quadrant flats. Plus, realign to mid-2023 aerials.
The footpaths from residential areas to Kingsley Woods are open. Drainage ditches.
Oak Court and Tiger Moth Lane both now have street signs
Finally some evidence on the ground for the name of The Quadrant (it's written on no 1)
These houses now finished/occupied, + realign to new (mid-2023) Bing aerials
Timberworks: pavilion has appeared
Timberworks: realign some features to new (mid-2023) Bing aerials
Timberworks sales office no longer here
The main entrance to this block (with the buzzers) is in fact on the other side
1 Discovery Drive: adjust for new (mid-2023) Bing aerials
Eddington: mark new buildings visible on aerials as building=construction