-
Berkel-Enschot NL De Kraan crossing with Boekbinderijstraat open for all traffic again (removed cycle path between Boekbinderijstraat and cycle path to Rauwbrakenweg)
-
Koksijde B Jaak van Buggenhoutln roughly corrected cycle path between roundabout Zeelaan and Kerkplein after reconstruction Buggenhoutln
-
Berkel-Enschot NL changed Brevierstraat from food path to cycle path
-
Tilburg NL corrected cycle path Willy den Oudenstraat
-
Tilburg NL added cycle path Willy den Oudenstraat
-
Berkel Enschot removed connection De Kraan to Koningsoordlaan. Changed to cycle path.
-
Drunen removed demolished buildings Lipsstraat 50,50A and 54
-
Drunen removed demolished buildings Lipsstraat 50,50A and 54
-
Drunen Lipsstraat - Tinie de Munnikstraat removed one way direction of cycle path
-
Connection Prins Hendrikstraat with Lipsstaat (Drunen) is blocked
-
Drunen Lipsstraat cycle path west side changed to two way direction
-
Tilburg NL added road betweenSint Corneliusstraat and Kevelaerstraat
-
Tilburg NL foot path Havendijk added edited
-
Tilburg Spoordijk - Oisterwijksebaan footpath at soccer fields added
-
Tilburg Leijweg not connected with Driehuizendijk anymore. Food route changed to use Dokter Bloemenlaan and Driehuizendijk
-
Tilburg Leijweg not connected with Driehuizendijk anymore. Food route changed to use Dokter Bloemenlaan and Driehuizendijk
-
Drunen Lipsstraat connected Alcoalaan with roundabout, removed temporaty road between Lipsstraat and Alcoalaan
-
Drunen Lipsstraat connected Alcoalaan with roundabout, removed temporaty road between Lipsstraat and Alcoalaan
-
Changed Leijweg Tilburg, road is blocked for cars. Bicycle route is following Driehuizendijk - Dokter Blowmenlaan.
-
Changed Leijweg Tilburg, road is blocked for cars. Bicycle route is following Driehuizendijk - Dokter Blowmenlaan.