1. NCDOT U-5813 US-64/NC-49/I-73/I-74 interchange revisions

    Closed · #153009366
    0
  2. NCDOT U-5813 US-64/NC-49/I-73/I-74 interchange revisions

    Closed · #153009129
    0
  3. R-5777C C204695 US 70 Improvements from Havelock Bypass to east of SR 1110 (Thurman Rd). Project let 1/17/2023.

    Closed · #146745839
    0
  4. snapping

    Closed · #146634805
    0
  5. NCDOT project I-2513AB new I-40 WB ramp to US 19/23 NB proposed letting 4/16/2024

    Closed · #146634751
    1
  6. NCDOT project I-2513AB new I-40 WB ramp to US 19/23 NB proposed letting 4/16/2024

    Closed · #146633783
    0
  7. NCDOT project I-2513B I-26 Connector design-build project letting 2/20/2024

    Closed · #146610892
    0
  8. NCDOT project I-2513B I-26 Connector design-build project letting 2/20/2024

    Closed · #146610439
    0
  9. Lanes

    Closed · #145778145
    0
  10. geometry

    Closed · #145768627
    0
  11. I-40/I-77 main line and C/D lanes open.

    Closed · #145768609
    0
  12. R-4045/BR-0012 design-build project.

    Closed · #145766850
    0
  13. Delayed until 2025.

    Closed · #142006454
    0
  14. Will be signed as Exit 211 after Shelby Bypass construction.

    Closed · #141962331
    0
  15. Future exit numbers.

    Closed · #141962242
    0
  16. Exits opened and signed.

    Closed · #141962083
    0
  17. No tracks.

    Closed · #141553510
    0
  18. P-5705A Wye Connection Track at Charlotte Junction. Awarded 7/27/2023, construction starting 9/5/2023.

    Closed · #141106680
    0
  19. attributes

    Closed · #140461607
    0
  20. attributes

    Closed · #140420996
    0
Load more
Loading...