Footpath through forest is private for all vehicles (only pedestrians allowed)
Closed
-
Footpath and bridge is actually not existing (anymore).
Closed
-
Construction in Reisingerstr. ended, access for all vehicles, new pavement from intersecion Maistr. to Lindwurmstr.
Closed
-
Construction in Reisingerstr. changed - completed east of Maistr. (open for bicycles in both directions), part of road near Lindwurmstr. closed for vehicles - presumably until end of September 2024.
Closed
-
Construction in Thalkircher Str. ended, reopened for both directions.
Closed
-
Construction in Thalkircher Str./Waltherstr. partly ended, surface has been restored, northbound bicycle lane reopened.
Closed
-
Construction in Thalkircher Str. until Dec. 20th, 2024 - former northbound bicycle lane now forbidden for bicycles, pedestrians only.
Closed
-
Path accessible for bicycles and pedestrians during construction
Closed
-
Construction in Thalkircher Str. and Waltherstr. until Dec. 20th, 2024. Thalkirchner Str. became one-way southbound between Walther- and Kapuzinerstr., Waltherstr. one-way eastbound between Frauenlob- and Thalkirchner Str.
Closed
-
clothes and shoes recycling removed at this site, it won't be replaced after clothes/shoes container was destroyed due to vandalism
Closed
-
clothes recycling removed at this site, it won't be replaced after clothes container was destroyed due to vandalism
Closed
-
oneway road (also for bicycles) during construction work presumably until May 31st, 2024
Closed
-
oneway road also for bicycles during construction work presumably until May 31st, 2024
Closed
-
Fixed typo (Kläranalge -> Kläranlage)
Closed
-
Deleted Connictro GmbH as the company is permanently closed
Closed
-
Changed type of barrier to stile, as pedestrians need to step over and bicycles need to be lifted. Discovered by myself during bicycle tour.
Closed
-
Connictro GmbH moved to new location Rupert-Mayer-Str. 44 on July 2, 2018
Closed
-
Street blocked by gate, accessible for construction vehicles only
Closed