Your Village Maps's Notes
Notes submitted or commented on by Your Village Maps
« Previous | Page 1 | Next »
Id | Creator | Description | Created at | Last changed | |
---|---|---|---|---|---|
![]() |
1251639 | Kwik Trip, Store #619 has moved to this side of 8th st. |
about 5 years ago | 17 days ago | |
![]() |
3509228 | gpserror | Are these track roads real or are they fantasy mapping?
|
3 months ago | 17 days ago |
![]() |
3594219 | Your Village Maps | Is this correct as mapped or does it need to be revised? Is this really under construction or completed or just proposed, and is the old Highway 14 now CR 34 or something else or is it permanently closed/removed? |
17 days ago | 17 days ago |
![]() |
2566063 | gpserror | A roundabout will be installed here, construction begins Fall 2021. Weld County and City of Greeley will pay for it. Source: Local news, https://www.weldgov.com/newsroom/2021_news/agreement_to_bring_major_changes_to_intersection |
about 2 years ago | about 1 month ago |
![]() |
2499545 | Your Village Maps | I deleted the polygon (not needed to begin with) and the relation for Ponnequin Wind Farm (according to USWTDB it was four in one) after discovering that this wind farm, the first in Colorado, built from 1999 to 2001, was decommissioned at the end of 2015. Apparently the wind turbines were not removed until either very late 2019 or some time in 2020. I have added "fixme" and "note" tags to the nodes representing the wind turbines. I am unsure what to do, so I am not doing anything else at this point. I assume the features should be in Open Historical Map? David Wisbey aka Your Village Maps
|
about 2 years ago | about 2 months ago |
![]() |
3397189 | Your Village Maps | This interchange has been rebuilt as an SPUI interchange but as of now (12 Oct. 2022) no imagery shows this. Needs to be updated when imagery at least shows enough construction to map it. |
6 months ago | 2 months ago |
![]() |
3001515 | Your Village Maps | Could someone confirm or deny that this median crossing has been removed, as well as traffic signals? |
about 1 year ago | 3 months ago |
![]() |
3310525 | Your Village Maps | The entire length of Trans-Haryana Expressway needs to be remapped to show its completion, including all motorway links constructed. It opened on 1 Aug 2022. |
8 months ago | 8 months ago |
![]() |
3310524 | Your Village Maps | According to a Facebook post by KYTC District 3, this interchange has been rebuilt with an entirely new configuration; as of 11 Aug 2022 no imagery available in iD shows the construction, however. |
8 months ago | 8 months ago |
![]() |
2538957 | Duplicated hotels |
about 2 years ago | 8 months ago |
« Previous | Page 1 | Next »