1. This is not a passable public road north of this gate. The gate has posted signs to keep out.

    Closed
    #173820026 2 3 0 0
  2. Updated intersection to improve directions. Specifically so it won't say "right turn" when traveling east on Lakeshore and continuing eastbound after the bridge.

    Closed
    #172040131 5 10 0 0
  3. Construction has opened this up to two lanes again.

    Closed
    #171809325 0 1 0 0
  4. The construction along here allows two way travel now.

    Closed
    #171608065 0 1 0 0
  5. I'm not even sure this crossing qualifies as a "ford" You're not driving a vehicle across this section of the river. You could swim or cross with a boat. Only if there was a major drought and you had an off-road capable vehicle could you cross here.

    Closed
    #171510091 0 1 0 0
  6. Bridge construction is complete. This is open for travel now.

    Closed
    #171476575 0 1 0 0
  7. Checkers Drive-In Home of the best Burger in the World

    Closed
    #170270438 6 0 0 0
  8. One lane closed due to construction. Only eastbound traffic is allowed.

    Closed
    #170132352 2 4 0 0
  9. Road closed due to construction. Sign reads, "Solon Rd will be closed 6/6/25 for 65 days"

    Closed
    #169927898 3 3 0 0
  10. Bridge closed due to construction. I was riding there today and had to use a detour.

    Closed
    #169927417 4 1 0 0
  11. Bridge being worked on. Road closed. "Starting July 7th, 2025. Closure Duration: Approximately 112 Days."

    Closed
    #169885874 1 2 0 0
  12. Bridge is being replaced and is currently out. I was riding there today and it was completely gone. https://www.transportation.ohio.gov/projects/projects/112999

    Closed
    #169841907 4 2 0 0
  13. Fixed my construction tags to allow westbound one lane traffic flow.

    Closed
    #169615995 0 3 0 0
  14. There is only one lane open due to construction. That lane moves west only.

    Closed
    #169536212 0 1 0 0
  15. There is only one lane open due to construction. That lane moves west only.

    Closed
    #169536159 0 1 0 0
  16. There is only one lane open due to construction. That lane moves west only.

    Closed
    #169536150 0 1 0 0
  17. Road closed due to construction (Blair Road Retaining Wall Replacement project). https://leroyohio.com/2025/07/blair-road-closure-7-14-2025

    Closed
    #169528856 2 2 0 0
  18. Updated lane:forward to zero to stop eastbound routing, due to long term construction. The eastbound lane is closed.

    Closed
    #169527614 0 1 0 0
  19. Due to construction, only eastbound traffic is allowed on this section of road.

    Closed
    #169485615 1 6 0 0
  20. Construction is complete and the bridge is open now. I rode over it today.

    Closed
    #169214399 0 3 0 0