-
This is not a passable public road north of this gate. The gate has posted signs to keep out.
Closed
-
Updated intersection to improve directions. Specifically so it won't say "right turn" when traveling east on Lakeshore and continuing eastbound after the bridge.
Closed
-
Construction has opened this up to two lanes again.
Closed
-
The construction along here allows two way travel now.
Closed
-
I'm not even sure this crossing qualifies as a "ford" You're not driving a vehicle across this section of the river. You could swim or cross with a boat. Only if there was a major drought and you had an off-road capable vehicle could you cross here.
Closed
-
Bridge construction is complete. This is open for travel now.
Closed
-
Checkers Drive-In Home of the best Burger in the World
Closed
-
One lane closed due to construction. Only eastbound traffic is allowed.
Closed
-
Road closed due to construction. Sign reads, "Solon Rd will be closed 6/6/25 for 65 days"
Closed
-
Bridge closed due to construction. I was riding there today and had to use a detour.
Closed
-
Bridge being worked on. Road closed.
"Starting July 7th, 2025. Closure Duration: Approximately 112 Days."
Closed
-
Bridge is being replaced and is currently out. I was riding there today and it was completely gone.
https://www.transportation.ohio.gov/projects/projects/112999
Closed
-
Fixed my construction tags to allow westbound one lane traffic flow.
Closed
-
There is only one lane open due to construction. That lane moves west only.
Closed
-
There is only one lane open due to construction. That lane moves west only.
Closed
-
There is only one lane open due to construction. That lane moves west only.
Closed
-
Road closed due to construction (Blair Road Retaining Wall Replacement project).
https://leroyohio.com/2025/07/blair-road-closure-7-14-2025
Closed
-
Updated lane:forward to zero to stop eastbound routing, due to long term construction. The eastbound lane is closed.
Closed
-
Due to construction, only eastbound traffic is allowed on this section of road.
Closed
-
Construction is complete and the bridge is open now. I rode over it today.
Closed