1. MoDOT I-270 project reconstructed Old Dunn Rd alignment and consolidated two signalized intersections into one signalized intersection for SB Lindbergh at Lynn Haven. The project also added two new signalized intersection; Old Dunn @ Dunn Rd and Dunn Rd @

    Closed · #135932898
    0
  2. Missouri Department of Transportation I-270 project relocated a few exit ramps location along eastbound I-270. These exit ramps opened to traffic as of December 2022.

    Closed · #131395616
    0
  3. Missouri Department of Transportation I-270 project removed the I-270 WB exit ramp to West Florissant permanently on December 14, 2022.

    Closed · #130434931
    0
  4. Missouri Department of Transportation I-270 project has completed roundabout on Dunn road at I-270 WB on ramp at I-170. Dunn road is also opened at Cold Water Creek bridge west of the roundabout allow Dunn traffic to continue through Dunn to Lindbergh.

    Closed · #129161159
    0
  5. Missouri Department of Transportation I-270 project fully opened the EB I-270 off ramp to Pershall Road as off October 2022.

    Closed · #129159983
    0
  6. The I-270 project permanently removed I-270entrance ramp from West Florissant Ave as of October 3rd., 2022

    Closed · #127048602
    0
  7. The I-270 project permanently converted Dunn road between New Hall Ferry and Washington/Elizabeth to ONE-WAY going westbound direction ONLY as of September 21, 2022. Pershall road was ONE-WAY going eastbound ONLY between Washington/Elizabeth and West Flor

    Closed · #126506859
    0
  8. The I-270 project permanently closed NB MO367 to I-270 WB loop ramp as of September 16, 2022. The new signal intersection was activated for NB MO367 traffic to turn left onto I-270 WB.

    Closed · #126468842
    0
  9. The I-270 project permanently closed I-270 EB exit ramp to New Florissant Ave. as of September 6, 2022. New ramp to be opened near the old location soon.

    Closed · #126131217
    0
  10. The I-270 project closed I-270 EB exit ramp to West Florissant Ave. and I-270 EB entrance ramp from Washington/Elizabeth Road as of August 29, 2022. The I-270 project also opened I-270 EB entrance ramp from Pershall Road.

    Closed · #125628829
    0
  11. Missouri Department of Transportation I-270 project completed the square interchange at Lindbergh. I-270 WB between I-170 and Lindbergh has been moved back to straight alignment.

    Closed · #125271365
    0
  12. Missouri Department of Transportation built new southbound 67 alignment and removed southbound old alignment. The new southbound 67 road was opened to traffic on July 11, 2022.

    Closed · #124114688
    0
  13. Missouri Department of Transportation permanently closed eastbound I-270 to northbound MO367 loop ramp on July 25. Traffic will need to take the existing eastbound I-270 to 367 ramp then turn left at the new signal. Eventually, there will be a new flyover

    Closed · #124114329
    0
  14. Missouri Department of Transportation opened southbound US67 (Lindbergh) new alignment to public on Monday July 11, 2022. The old southbound US67 alignment were permanently closed.

    Closed · #123907316
    0
  15. The Missouri DOT I-270 North Project converted Pershall Road between Hanley/Graham and New Florissant to one-way. Pershall Road is now for EB direction only.

    Closed · #122089810
    0
  16. The Missouri DOT I-270 North Project converted Pershall Road between Hanley/Graham and New Florissant to one-way. Pershall Road is now for EB direction only.

    Closed · #121847679
    0
  17. The Missouri DOT I-270 North Project removed the SB MO367 to EB I-270 loop ramp permanently on Tuesday 5/31/2022. The loop ramp was replaced by the new signalized intersection. SB MO367 traffic is now need to turn left at the signalized intersection onto

    Closed · #121847552
    0
  18. Missouri Department of Transportation is opening U-turn bridge at I-270 and Washington/Elizabeth on Feb 11.

    Closed · #117474518
    0
  19. Missouri Department of Transportation is closing multiple section including entrance and exit ramps of I-44 near Broadway Bridge. The work started Feb 7th to Feb 18. Southbound I-70 express lane is permanently closed.

    Closed · #117252469
    1
  20. MoDOT I-270 Project is permanently closing I-270 WB exit ramp to New Halls Ferry on Nov 16, 2016. MoDOT I-270 Project is converting outer road to ONE-WAY between Linnel and New Halls Ferry permanently on November 16, 2016

    Closed · #113572355
    0