Insertion of missing line parts into the relation
Insertion of missing line parts into the relation
Improvement of the connection at substation Gelsenberg after survey at the station
Improvement of the connection at substation Gelsenberg after survey at the station
Changing substation Siems to non multipolygon
Insertion missing role "line" in the relation
Insertion missing role "line" in the relation
Deletion of Vierraden 110kV from the relation
Correction of the relation between Maasbracht and Siersdorf according to "Statisches Netzmodell"
Exchanged the substation in LU
Insertion missing role "line" in the relation
Insertion of missing substation Dellmensingen into the relation
Improvement of the relation since it is used with 220kV
Deleted HGÜ converter Bentwisch from the relation
Deleted HGÜ converter Bentwisch from the relation
Correction of the roles in the relations
Improvement of the connections from/to Staudinger according to "Statisches Netzmodell"