-
T5 Reconstruction. I couldn't find the other construction type, please change if you find it. Expected opening 12/2027
Closed
-
Expanded apron, will need to wait for new imagery to provide better representation
Closed
-
Extended footpath into new part of Terminal MSC
Closed
-
Added the holdroom IDs for the new gates at MSC South and moved the apron centerlines so they are better represented. The lines are the map are obsolete and represent the old ramp. The new gates are all for Group III aircraft (A321 or smaller)
Closed
-
Removed airside elements of terminal 5. Can someone help to remove the rest of the apron, I can't seem to remove the part around the Terminal 5 building. Area has been barricaded as is now a construction area.
Closed
-
DD and CC renamed to E18 and E16 effective 8/7/25
Closed
-
Parking lot no longer exists.
Closed
-
C17 Ramp lead-in Centerline does not extend into the ramp
Closed
-
Fixed issue with D crossing P
Closed
-
There is no 52J
Closed
-
Updated Terminal 7 gates
Closed
-
Updated gates at Terminal 6
Closed
-
Removed parking stands no longer in D9. Terminal 3 is now open, the image needs to be updated.
Closed
-
Removed the D14 segment between E and D, added the new segments W and V between E and D. Image needs to be updated
Closed
-
fixed a label error
Closed
-
Added highspeed exit S from 24R across 24L to E. Will need image update.
Closed
-
Tried to make K1, K2, and K3 more visible
Closed
-
connected vehicle service road P to D
Closed
-
removed building features no longer in existence
Closed
-
Removed building features that no longer exist in real life. Image needs to be updated.
Closed