-
Track reverted to Rail Line
Closed
-
Changed Cowley Branch line to Railway Under Construction with provisional opening date of December timetable change in 2029. Information as per Network Rail press release 23/10/2025
Closed
-
Updated details to ibis budge hotel from etap
Closed
-
Added buildings on Nantwich Road
Closed
-
Change of business type to coffee shop from previous business
Closed
-
Pub has closed down
Closed
-
Speed limits and track status changed to tracks at Crewe station
Closed
-
Brocklebank Pub now closed
Closed
-
As per Network Rail's Network Change reference NC/G1/2016/SCOT/0647-V5 line has been abandoned
Closed
-
Connection from the Powderhall Branch has been removed with the mainline track where points were previously has been "plain lined" as per Network Rail Network Change document
Closed
-
Speed limits added to Bristol Parkway to Avonmouth line plus extra crossover. Info as per Network Rail Sectional Appendix
Closed
-
Speed limits added to the Sharpness Branch as per Network Rail Sectional Appendix
Closed
-
Speed limits added to Thames Haven branch plus the Thames Gateway Port as per information from the Network Rail Sectional Appendix
Closed
-
Speed limits added to Chatham Mainline from Longfield to just outside Rochester, with data from Network Rail's Sectional Appendix document
Closed
-
Speed limits added to sidings south of Crewe station
Closed
-
Speed limits added to North Kent line, including at Dartford station
Closed
-
Speed limits added to Blackheath Tunnel and Angerstein Wharf as per the Sectional Appendix
Closed
-
Speed limits added to Basford Hall Independent lines plus crossovers at Basford Hall Junction
Closed
-
Added businesses
Closed
-
Speed limits added, plus track identification of either Up or Down lines
Closed