The former Terminal A's concourses have been demolished.
Eppley Airfield is now undergoing terminal redevelopment, beginning with the concourses.
Removed Terminals B and C and added construction zone because they are in the process of demolition.
Removed circle lots because they have been razed.
Added gates at Ashgabat Airport
Turned Concourse D extension into an actual part of Terminal 4 since construction is complete.
Added recent Concourse A extension in Terminal 4.
Fixed Terminals B and C shapes and changed highway tags on jetways to footways.
Tweaked jetways to have bridge tags and added jetways to former terminals.
Removed future expansion and re-added terminals.
Added names for jetways and place for future Concourse A South expansion.
Changed ticket counter names to be shorter, added test walls to see how they look on the map.
Added jetways and fixed apron gaps around new terminal. Added ticket roles to check-in areas.
Added new terminal apron and surface lot designations.
Added restaurants and shops locations as well as check-in desks and security locations.