[St. Albert, AB] McKenney Ave MUP now connects whole distance
[Edmonton, AB] Rossdale road adjecent MUP now built, other modifications nearby for demos
Update to ball diamonds numbering
Add whether public transport stops are lit
Specify whether public transport stops have shelters
Specify whether roads have sidewalks
Specify whether pedestrian crossings have traffic signals
Specify whether pitches are lit
[Edmonton, AB] Oliver, rebuilding 121 St and 105 Ave bike routes
[Edmonton, AB] 83 Ave cycling route, adding directionality to counterflow segment
[St. Albert, AB] Woodlands last few buildings geo, land use, sidewalks and addresses
[Edmonton, AB] westmound, new demo and build observed on survey
[St. Albert, AB] Woodlands more updates to building geo, sidewalks and landuse
[Edmonton, AB] new construction along 142 St
[St. Albert, AB] Woodlands more updates to building geo, sidewalks and landuse
[Sturgeon County, AB] road surfaces, fixing water crossings, alignments, railway alignment