1. voltage of PL-Ukraine connector is not consistent with the build and continuity on either end of the line. Equipment exists on PL for conversion down from 750kV, but not on the Ukraine side for conversion up to 380kV.

    Closed · #146461788
    0
  2. Correction of voltage Kiisa-Pussi line from 220kV to 110kV. There are no 220kV facilities at either end of the line and sat imagery shows landing at 110kV yard at Pussi SS.

    Closed · #132500829
    0
  3. removal of detailed critical infrastructure targeted by russia.

    Closed · #131934881
    0
  4. removal of detailed critical infrastructure targeted by russia.

    Closed · #131934329
    0
  5. removal of detailed critical infrastructure targeted by russia.

    Closed · #131934048
    0
  6. removal of detailed critical infrastructure targeted by russia.

    Closed · #131933518
    0
  7. removal of detailed critical infrastructure targeted by russia.

    Closed · #131931591
    0
  8. .

    Closed · #131931160
    0
  9. .

    Closed · #131929737
    0
  10. Correction of voltage and improper mapping of 500kV bypassing Charni Yar 220kV SS

    Closed · #131929211
    0
  11. .

    Closed · #131928107
    1
  12. .

    Closed · #131904938
    0
  13. .

    Closed · #131904335
    0
  14. .

    Closed · #131904080
    0
  15. removal of $150 million in SS equipment that should not be on the OSM.

    Closed · #131903506
    0
  16. removal of misidentified transformers & power features at Lutsk SS

    Closed · #131903335
    0
  17. removal of misidentified transformers at Rivne & Hrabiv SS

    Closed · #131903202
    0
  18. cleanup of Rivne NPP, removal of misidentified power features listed as transformers

    Closed · #131903051
    0
  19. .

    Closed · #131902895
    0
  20. added transformers at Kuchurgan SS, landed circuits, cleanup minor mapping issues.

    Closed · #131902723
    0