-
Updated the Tunel Oriente and the connecting roads. The tunnel opened on 8/14/2019.
Closed
-
Removed incorrect Geo
Closed
-
Added turn restriction and slip road based on aerial imagery.
Closed
-
Added turn restriction.
Closed
-
Added condtional turn restriction
Closed
-
Added construction tag to a portion of Ellin Rd that will be under construction for a year. https://www.purplelinemd.com/construction/2018/08/29/purple-line-transit-constructors-construction-update-ellin-road-closure-beginning-on-or-about-october-1-2018/
Closed
-
Added missing roads and modified tags to match the new residential area.
Closed
-
Modified incorrect road geometry.
Closed
-
Added oneway tag based on aerial imagery.
Closed
-
Added missing intersection node
Closed
-
Added missing intersection node
Closed
-
Added missing service road.
Closed
-
Added missing residential road segements.
Closed
-
Added missing residential road segement.
Closed
-
Added missing residential road.
Closed
-
Connected incorrectly disconnected roads
Closed
-
Added missing service road.
Closed
-
Added missing turn restriction based on aerial imagery.
Closed
-
Added missing road segments in Brasilia.
Closed
-
Deleted driveway tag from parking lot.
Closed